91% probability BHP's September-2026 quarter WAIO iron ore production lands at or above 58Mt on a BHP-share basis — roughly 8% below the quarterly pace implied by its own FY2027 guidance of 253–264Mt. Resolves ~21 Oct 2026.
BHP guided FY2027 WAIO iron ore production to 253–264Mt on a BHP-share basis (286–298Mt on a 100% basis), after a record FY2026 of 264.7Mt. That guide implies a quarterly pace of roughly 63–66Mt. Source: BHP operational review for the year ended 30 June 2026 (bhp.com).
We lock a binary: BHP reports Western Australia Iron Ore production of at least 58 million tonnes on a BHP-share basis for the September 2026 quarter, per its quarterly operational review. Confidence 91%.
BHP guided FY2027 WAIO production to 253–264Mt on a BHP-share basis after a record 264.7Mt year, implying roughly 63–66Mt a quarter. Our 58Mt floor sits about 8% below the low end of that implied pace. The September quarter also falls outside the Pilbara cyclone season, which is the usual source of quarterly disruption. Confidence 91%, not higher, because an unplanned outage at a major hub, a rail incident or a port constraint can each take several million tonnes out of a single quarter. Scored on the BHP-share figure, not the 100% basis.
RAOSCAFF locks P-152 on 2026-08-13, before the September-quarter operational review. Scored against BHP's reported Q1 FY2027 WAIO iron ore production on a BHP-share basis versus a 58Mt floor.
An unplanned hub outage, a rail incident or a port constraint is the disclosed tail — each can remove several Mt from a quarter.