RaoscaffResearch
Prediction Series · Lock · Issue P-351
Prediction Series · P-351

The tonnes, not the zinc price.

91% probability Hindustan Zinc's FY2027 mined metal production reaches at least 1,100 kt, against guidance of 1,150 kt plus or minus 10 kt. The first half delivered a record 539 kt; the second half needs 561 kt against 591 kt a year earlier.

Type · Prediction Lock · guidance-anchored, mining volume Locked · 2026-11-05 · before the FY2027 production release Resolves · ~2027-04-05 · Hindustan Zinc Q4 FY2027 production release (NSE: HINDZINC) Scored · binary: FY2027 mined metal production >= 1,100 kt yes/no
Hindustan Zinc FY2027 mined metal · our locked floor
1,100 kt
mined metal content · vs 1,150 ±10 kt guided

Hindustan Zinc guided FY27 mined metal production of 1,150 KTPA plus or minus 10 KT and refined metal of 1,100 KTPA plus or minus 10 KT. H1 FY27 mined metal was a record 539 kt, up 3% YoY; FY26 mined metal content was 1,114 kt.

— 1 · The Locked Call

Hindustan Zinc's FY2027 mined metal is at least 1,100 kt — P = 0.91.

We lock a binary: Hindustan Zinc's mined metal production for the year to 31 March 2027, as published in its production release, is 1,100 thousand tonnes or more. Confidence 91%.

Guidance is 1,150 kt plus or minus 10 kt. The threshold sits 40 kt, about 3.5%, below the bottom of that range: a narrow buffer, because mine output is a steady line.

— 2 · Refuse the price bet

Earnings move with the LME. Tonnes move with the mine.

Hindustan Zinc's profit is driven by zinc and silver prices, which this series does not forecast: a directional commodity call is a price bet whatever the disclaimer says. Production is what management controls and guides.

Same rule as Vale's tonnes, ONGC's barrels and BHP's iron ore. First zinc exposure in the series; the link to Novelis (P-342) through base metals is weak and is noted rather than claimed as independent.

— 3 · Mined, not refined

Two production lines, 50 kt apart.

The company guides two volumes: mined metal (1,150 kt) and refined metal (1,100 kt). They are different lines, and a threshold of 1,100 kt means something entirely different on each. The criterion names MINED metal content and rules out refined and saleable metal and silver.

The arithmetic: the first half banked 539 kt. Reaching 1,100 kt needs 561 kt in the second half, against 591 kt in the second half of FY2026, so the lock tolerates a year-on-year second-half decline of about 5%. The fourth quarter is the seasonal peak. It fails on a significant mine stoppage, a safety incident or a grade problem.

Locked on 2026-11-05 — scored against Hindustan Zinc's reported FY2027 mined metal production.

RAOSCAFF locks P-351 on 2026-11-05, before the FY2027 production release. Scored against mined metal production as published by Hindustan Zinc for the year to 31 March 2027.

Locked
2026-11-05 (commit timestamp on origin/main)
Resolves
~2027-04-05 — Hindustan Zinc Limited production release for Q4 and FY2027
Source
Hindustan Zinc Limited quarterly production release for the year ended 31 March 2027 (NSE: HINDZINC)
Scored by
Binary: YES if FY2027 mined metal production (mined metal content, the line that was 1,114 kt in FY2026) is 1,100 kt or more; NO if below. Explicitly NOT refined metal, NOT saleable metal and NOT silver.

Two volumes, fifty kilotonnes apart. The criterion names the one the mine produces.