91% probability KGHM Polska Miedź S.A. produces at least 575 kt of electrolytic copper in 2026, against a 589 kt budget. Nine months delivered 440.9 kt; the fourth quarter needs 134.1 kt, 44.7 kt a month against September's 48.7 kt.

Type · Prediction Lock · guidance-anchored, copper smelting volume Locked · 2026-11-05 · before the FY2026 production data Resolves · ~2027-01-22 · KGHM preliminary production data for December 2026 (WSE: KGH) Scored · binary: KGHM Polska Miedź S.A. 2026 electrolytic copper >= 575 kt yes/no
KGHM S.A. 2026 electrolytic copper · our locked floor
575 kt
cathode production · vs 589 kt budgeted

KGHM's 2026 budget sets electrolytic copper production at 589 thousand tonnes. Its preliminary production data for September 2026 show electrolytic copper of 48.7 kt in the month and 440.9 kt for January-September 2026, against 421.0 kt a year earlier.

— 1 · The Locked Call

KGHM's 2026 electrolytic copper is at least 575 kt — P = 0.91.

We lock a binary: KGHM Polska Miedź S.A.'s electrolytic copper production for calendar 2026 is 575 thousand tonnes or more. Confidence 91%.

The budget is 589 kt. The threshold sits 14 kt, about 2.4%, below it. On the unbanked fourth quarter the buffer is about 9.5%, which is where a smelter outage would land.

— 2 · The arithmetic

440.9 kt banked. 134.1 kt to come.

January to September produced 440.9 kt, up from 421.0 kt a year earlier. Reaching 575 kt needs 134.1 kt in the fourth quarter: 44.7 kt a month, against 48.7 kt in September. Reaching the budget would need 148.1 kt, or about 49.4 kt a month.

Smelter output is steady but exposed to planned and unplanned shutdowns. The lock fails on a material stoppage at the Głogów or Legnica smelters or a shortfall in purchased concentrate feed.

— 3 · Three copper lines, one criterion

Group payable, concentrate, or cathode.

KGHM reports at least three copper volumes: Group payable copper (which includes KGHM International and its share of Sierra Gorda), the parent company's copper in concentrate, and the parent company's electrolytic copper. They differ by more than 100 kt. The criterion names KGHM Polska Miedź S.A. electrolytic copper only.

First Poland lock. Copper tonnes, not the LME price, which this series does not forecast. Correlation, disclosed: Glencore copper production (P-230) is the series' other copper-volume lock; the operating risks are independent.

Locked on 2026-11-05 — scored against KGHM Polska Miedź S.A.'s reported 2026 electrolytic copper production.

RAOSCAFF locks P-354 on 2026-11-05, before the December 2026 production data. Scored against electrolytic copper production of KGHM Polska Miedź S.A. for January-December 2026.

Locked
2026-11-05 (commit timestamp on origin/main)
Resolves
~2027-01-22 — KGHM preliminary production and sales data for December 2026 (January-December column), confirmed in the FY2026 annual report
Source
KGHM Polska Miedź S.A. monthly preliminary production and sales report for December 2026 (kghm.com investors; WSE: KGH)
Scored by
Binary: YES if KGHM Polska Miedź S.A. electrolytic copper production for January-December 2026, as first reported in the December 2026 preliminary data, is 575 kt or more; NO if below. Explicitly NOT Group payable copper, NOT copper in concentrate and NOT sales.

Three copper lines, more than a hundred kilotonnes apart. The criterion names the cathode.