The first espresso makes the reveal. A technician’s inspection makes the business decision.
RAOSCAFF worked example using the assumptions below.
Request the serial number, age, service history, storage conditions and a list of missing parts. Have the receiving technician check model support, parts availability and site compatibility. Price export preparation, freight, local commissioning and a sensible warranty allowance.
| Evidence | What it establishes |
|---|---|
| WorkSafe New Zealand | Section 11.0 of the WorkSafe machinery guide covers both second-hand purchases and direct imports. Buyers in those situations still have duties. |
Obtain a condition report tied to the serial number and have a competent person assess the installation before promising service.
Illustrative example. In a hypothetical NZ$6,000 sale, acquisition and freight converted to NZ dollars total NZ$3,200. Allow NZ$600 commissioning and NZ$500 warranty provision. That leaves NZ$1,700 for repairs before overhead, tax and required profit. A NZ$1,200 repair leaves only NZ$500.
Ask the Australian dealer for the plate, repair history and condition photographs. Give the New Zealand technician the same identifiers before authorising freight. Obtain separate costs for removal, transport, inspection, commissioning and service support. If a missing component has no delivery date, the seller cannot quote a dependable opening day to the café.
Make the purchase conditional on an acceptable inspection. Ask the importer and technician to confirm cleaning, import requirements, electrical and pressure-system suitability and parts lead time for that unit. Get an installed-price indication from the prospective café.
The dealer may describe a machine as working because it powered on before removal. Ask what the technician can inspect before shipment and which tests require installation on site. If a major part is unavailable, recost freight, lead time and the intended café opening. Compare the revised total with a locally supported machine of similar capacity. Keep the seller’s condition statement separate from the technician’s commissioning evidence.
Buy only when the condition report and buyer price leave a repair margin. If the parts timeline would strand the café without a machine, select another unit. Before freight, identify the unit and available parts. At inspection, obtain a written repair allowance. Before café handover, document commissioning and the local service contact.
| Figure or finding | Primary source | Source cell or locator | Read on |
|---|---|---|---|
| Section 11.0 of the WorkSafe machinery guide covers both second-hand purchases and direct imports. Buyers in those situations still have duties. | WorkSafe New Zealand | 11.0 Buying second-hand or importing from overseas | 2026-11-24 |
| Illustrative inputs and derived results | RAOSCAFF worked scenario, reproduced in full here | Illustrative example. In a hypothetical NZ$6,000 sale, acquisition and freight converted to NZ dollars total NZ$3,200. Allow NZ$600 commissioning and NZ$500 warranty provision. That leaves NZ$1,700 for repairs before overhead, tax and required profit. A NZ$1,200 repair leaves only NZ$500. | Editorial model |
| Illustrative calculator | RAOSCAFF model | Output = (-1 × input) + (1700). Initial input 1200, initial output 500. | Editorial model |
Signing authority
Advocate · Founder, RAOSCAFF
Issued under his authority. Read and approved by him before release.