The first van looks beautiful. The second installer is holding the drawing upside down. That is where a custom job becomes a product.
RAOSCAFF worked example using the assumptions below.
Watch a second installer unpack the prototype instructions. Which component did they search for? Which clearance needed a call to the designer? A numbered packing list and a revision-controlled drawing may save more hours than a lower factory price.
| Evidence | What it establishes |
|---|---|
| Transport Victoria | Victoria directs converters to VSB 14, Section LH, Code LH11 and to VSI 5 for additional Victorian requirements. |
Confirm the exact mounting scope with the local fitter and the relevant approval authority before fabrication. Transport Victoria · Vehicle standards information
Illustrative example. Assume documenting and jigging the kit costs A$1,800 once. Saving three paid hours at A$80 per hour adds A$240 per eligible repeat fit, if the time is genuinely avoided or resold. Eight repeats generate A$1,920 of value and cover the setup. At six, A$360 remains unrecovered.
The Indian producer can repeat a cut list once the Australian fitter signs the prototype revision. Photograph where the first fitter paused to unpack, measure again or change a fixing. Have a different fitter time the second installation. Separate genuine hours saved from work shifted into preassembly, packing or final inspection.
Time one repeat fit on the same verified variant. Include unpacking, callbacks, local adjustments and replacement freight. Offer a distinct bespoke quote for out-of-family vans rather than hiding that work in the kit price.
Ask the second fitter to record time spent sorting unlabelled pieces and checking the latest drawing. A new jig may shorten cutting while displacing that same work to site. Compare combined workshop and installation time using the same start and finish points. If the revised packing order saves time, make it part of the controlled kit specification. State which variants and installed accessories were present on the trial vehicle.
Roll out the kit when a second fitter reproduces the result, the measured saving is real and signed orders can recover setup. File a new revision whenever changing a component affects the approved fit. At packing, check parts against the revision. At installation, time the actual sequence. On the next quote, separate demonstrated savings from time the estimator hopes to save.
| Figure or finding | Primary source | Source cell or locator | Read on |
|---|---|---|---|
| Victoria directs converters to VSB 14, Section LH, Code LH11 and to VSI 5 for additional Victorian requirements. | Transport Victoria | code LH11 campervan, motorhome conversion | 2026-11-24 |
| Illustrative inputs and derived results | RAOSCAFF worked scenario, reproduced in full here | Illustrative example. Assume documenting and jigging the kit costs A$1,800 once. Saving three paid hours at A$80 per hour adds A$240 per eligible repeat fit, if the time is genuinely avoided or resold. Eight repeats generate A$1,920 of value and cover the setup. At six, A$360 remains unrecovered. | Editorial model |
| Illustrative calculator | RAOSCAFF model | Output = (240 × input) + (-1800). Initial input 8, initial output 120. | Editorial model |
Signing authority
Advocate · Founder, RAOSCAFF
Issued under his authority. Read and approved by him before release.